Suvarnabhumi Airport Expansion Project

Pubtime:05.01.2024
【Font size:BigMidSmallPrint

Theproject is one of Thailand's major civic projects. The new terminal has a total floor area of 216,000 square meters, including D Hall, the south corridor, and the new terminal (levels 2-4). It features a symmetric distribution of 28 parking spots for planes on both sides and can increase the annual passenger flow from 45 million to 60 million. This expansion effectively alleviates the pressure on the old terminal due to the mass passenger flow and contributes to the development of Thailand's tourism industry.

04泰国素万那普机场扩建项目.jpg

Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180