Rooftop Solar Project of DfMA center

Pubtime:05.01.2026
【Font size:BigMidSmallPrint

To support Singapore's green transition in the built environment sector and lower operational emissions at the DfMA center, CSCEC launched a rooftop solar installation project. The works included structural reinforcement, electrical upgrades, and rooftop solar panel installation. With a total installed capacity of nearly 1 MW, the system cut approximately 138 tons of carbon dioxide emissions between August 1 and September 18, 2024—less than two months after installation.

4.5. DfMA中心分布式光伏安装工程.jpg


Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180