CSCEC tops out package 2 of Selbe Subcenter project in Mongolia

Pubtime:21.09.2026
【Font size:BigMidSmall】Print

蒙古国瑟尔贝副中心建设项目二标段全面封顶1.jpgread_image.png

Recently, CSCEC completed the topping-out of the package 2 of the Selbe Subcenter project in Ulaanbaatar, Mongolia. The milestone marks a shift from structural construction to interior finishing, mechanical and electrical installation, and outdoor construction.

The project is located in Ulaanbaatar's Chingeltei district and includes 26 residential buildings.

Excavation began in August 2025. To address groundwater conditions encountered during construction, the project team established a dedicated task force, which mapped the distribution, flow patterns and volume of groundwater and developed tailored solutions for different parts of the site.

蒙古国瑟尔贝副中心建设项目二标段全面封顶3.png

Winters in Mongolia last about six months, with temperatures dropping to minus 40 degrees Celsius. Strong winds and heavy snow are common throughout the season. To keep the project on track, the team planned its winter construction schedule well in advance and worked quickly to resume construction whenever weather conditions allowed.

蒙古国瑟尔贝副中心建设项目二标段全面封顶4.png

The Selbe Subcenter is a major urban renewal and public welfare project for Ulaanbaatar. Once completed, it will improve local housing conditions, expand public services, and bring tangible benefits to local residents.

Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180